IBIS Macromodel Task Group Meeting date: 07 Aug 2007 Members (asterisk for those attending): * Ambrish Varma, Cadence Design Systems Arpad Muranyi, Mentor Graphics Corp. Barry Katz, SiSoft * Bob Ross, Teraspeed Consulting Group David Banas, Xilinx * Donald Telian, consultant * Doug White, Cisco Systems Essaid Bensoudane, ST Microelectronics Ganesh Narayanaswamy, ST Micro * Hemant Shah, Cadence Design Systems * Ian Dodd Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics Ken Willis, Cadence Design Systems * Kumar, Cadence Design Systems Lance Wang, Cadence Design Systems Luis Boluna, Cisco * Michael Mirmak, Intel Corp. * Mike LaBonte, Cisco Systems * Mike Steinberger, SiSoft Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU * Radek Biernacki, Agilent (EESof) * Randy Wolff, Micron Technology Ray Comeau, Cadence Design Systems Richard Ward, Texas Instruments Sanjeev Gupta, Agilent Shangli Wu, Cadence Stephen Scearce, Cisco Systems Syed Huq, Cisco Systems Syed Sadeghi, ST Micro * Todd Westerhoff, SiSoft Vikas Gupta, Xilinx Vuk Borich, Agilent * Walter Katz, SiSoft -------------------------- Call for patent disclosure: No one declared a patent. ----- Opens: Donald Telian asked to discuss use of materials presented ------------- Review of ARs: - Todd clarify "electrically isolated" in BIRD - Maybe at the end of the summer - TBD - Michael Mirmak get specific data on the non-linear behavior problem - Long term, drop from AR list - Arpad: Write parameter passing syntax proposal for a possible BIRD - Question about if this is for just the API or for IBIS SPICE extensions - Michael M: this might be split up - Michael M asked Arpad to clarify the AR text - TBD - Arpad clarify text of "parameter passing syntax" AR - TBD - Arpad: Review the new macro library files. - TBD - Hemant will publish an open source reference model by Jul 17 - Ambrish will present a model and program today - TBD - Ian send relevant papers on related IEEE work - TBD - Ambrish send presentation to Mike - Done - Todd send draft Asia summit presentation - Done ------------- New Discussion: AMI tools cross testing progress: - SiSoft and Cadence swapped model source - Both sides debugging problems - Mike S. looked at code sent by Ambrish - Not done yet - Should have interoperability by the end of this week. Todd gave his proposed Asian summit presentation: - Page 1: - Title page typo will be fixed - Page 2: - Need to indicate that this flow is not where people are now - Ian plans to show 2 step process - Single step process brings a performance hit - Page 4: - Doug: Stateye is not really separate from Matlab - Michael M: may be legal restrictions on mentioning Matlab - Page 5: - Discussion of digital vs. analog equalization modeling - Page 7: - Michael M: Some characterization is done without existing IBIS - Michael M: Check with companies on exact names - Page 10: - Michael M: Might run into a time limit, may want to remove this one - Previous slide has some of the same content - Page 12: - Donald: Is there a connection between 2 step process and Init/GetWave? - Todd: No, Init and GetWave are essentially steps 2a and 2b - Page 13: - Originally submitted by Cadence/IBM - Radek: should Cadence and SiSoft be mentioned? - Todd: this is freely distributable, public domain - Bob: Will there be a public record of who gets the kits? - SiSoft and cadence willing to remove company names from presentation - Todd: copyright allows people to redistribute freely anyway - Todd: Not many people have asked for the software so far - Page 14: - Arpad: Change title to reference DAC - Term "as of" may not be clear to non-English speakers - Arpad: Should this mention the parameter passing BIRD? - Todd: Can we simply not mention a date? - Bob: Need separate presentations for the 2 conferences - Will not be posted on the ibis-atm website yet AR: Todd update Asia summit presentation Donald Telian asked when software would be ready: - Todd: Want to - Get feedback over the summer - Incorporate feedback in Sept - Present to IBIS committee - Donald: Some people might want to see the IBIS early - Todd: Demonstrating success will help the approval process - Michael M: Targeted for IBIS 5.0 - Next June would be optimistic - BIRD 74 was approved but missed IBIS 4.2 - Todd: Cadence has a new proposal that would simplify the IBIS file - Changes parameter declarations - Changes to IBIS would be minimal - EDA vendors still discussing Donald Telian asked if the work can be used by others: - Todd: It's all public - Michael M: Please include appropriate credit Next meeting: 14 Aug 2007 12:00pm PT